Reloj del Sol Wind Farm
EDP Renewables · Zapata County · ERCOT
Reloj del Sol Wind Farm is a 209.4 MW onshore wind facility near San Ygnacio in Zapata County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62207, operated by Reloj del Sol Wind Farm LLC with a May 2021 service month. EDP Renewables' current project fact sheet reports a 209 MW facility and identifies the project as online since 2020. Those operating milestones are kept separate. The plant is represented by four ERCOT resources at the RELOJ_ALL settlement point.
Overview
Key fields
- Operating capacity
- 209.4 MW
EIA
- Commercial operation
- May 2021
EIA
- Owner and developer
- EDP Renewables
EDP
- Settlement point
- RELOJ_ALL
ERCOT settlement point.
- Resource stack
- 4 resources
RELOJ_UNIT1 · RELOJ_UNIT2 · RELOJ_UNIT3
- Registry anchor
- Plant 62207
Reloj del Sol Wind Farm LLC
Profile
- Grid role
- Utility-scale onshore wind generation in South Texas.
- Capacity scope
- 209.4 MW EIA record · 209 MW EDP project fact sheet.
- Operating dates
- EDP lists online since 2020 · EIA service month May 2021.
- Market model
- Four ERCOT resources at RELOJ_ALL.
Structured profile
- Operating capacity
- 209.4 MW
EIA
- Project company
- Reloj del Sol Wind Farm LLC
EIA
- Owner and developer
- EDP Renewables
EDP
- Location
- Near San Ygnacio
EDP
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| RELOJ | 209.4 MW 209.4 MW summer | Onshore Wind Turbine Wind · WT | May 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 209.4 MW
- National rank
- #214
- TX rank
- #73
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
4 ERCOT market resources · Wind
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Project company and EIA registered operator | Reloj del Sol Wind Farm LLC | EIA May 2026 generator inventory |
| Market resources | RELOJ_UNIT1, RELOJ_UNIT2, RELOJ_UNIT3, RELOJ_UNIT4 | Linked ERCOT resources. |
| Grid selection | plant:plant-62207 | Canonical asset page /ercot/assets/plant/reloj-del-sol-wind-farm. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- EIA generator service monthEIA May 202...
EIA reports May 2021.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Las Lomas Wind Project
Wind · 201.6 MW
Zapata County
Javelina Wind Energy II, LLC
Wind · 200 MW
Webb County
Rio Bravo Windpower, LLC
Wind · 237.6 MW
Starr County