Rodeo Ranch Energy Storage
Plus Power · Reeves County · ERCOT
Rodeo Ranch Energy Storage is a 300 MW / 600 MWh, two-hour standalone battery system on roughly 13 acres near Pecos in Reeves County, Texas.
Overview
Key fields
- Power
- 300 MW
EIA and Plus Power
- Energy
- 600 MWh
EIA and Plus Power
- Duration
- 2 hours
Power / energy
- Debt financing
- $276M
First Citizens
- Operating month
- Dec 2023
EIA and Plus Power
- Registry anchor
- Plant 67175
Rodeo Ranch Energy Storage, LLC
Resource stack
- 2 resources
RRANCHES_ESR1 · RRANCHES_ESR2
Profile
- Power and energy
- 300 MW / 600 MWh · two-hour duration.
- Market role
- Merchant energy and frequency-stabilizing services in ERCOT.
- Interconnection
- Adjacent to TNMP's 138 kV Worsham Substation.
Structured profile
- Power / energy
- 300 MW / 600 MWh
EIA and Plus Power
- Site area
- ~13 acres
Rodeo Ranch project site
- Interconnection
- TNMP Worsham Substation · 138 kV
Rodeo Ranch project site
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| RODE1 | 300 MW 300 MW summer | Batteries Electricity used for energy storage · BA | Dec 2023 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 300 MW
- National rank
- #11
- TX rank
- #3
Monthly generation
Download CSVEIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
ERCOT disclosed dispatch
2 ERCOT market resources · Battery / storage
Dispatch
3 mo through May 21, 2026Cycles/day is discharged energy vs. usable capacity (~724 MWh). Capacity factor is avg discharge vs. peak.
Output by hourlocal time · 90 days through May 21, 2026
Latest disclosed outputhourly · 2 weeks ending May 21, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Market resources | RRANCHES_ESR1, RRANCHES_ESR2 | Linked ERCOT resources. |
| Grid selection | plant:plant-67175 | Canonical asset page /ercot/assets/plant/rodeo-ranch-energy-storage. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Battery Entered ServiceEIA May 202...
EIA and Plus Power report December 2023 operation.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.