Spinning Spur Wind II
EDF Renewable Asset Holdings, Inc. · Oldham County · ERCOT
Spinning Spur Wind II is an EIA-listed onshore wind turbine facility with 161. UBS International Infrastructure Fund (UBS) is the current owner; EDF Renewable Asset Holdings, Inc. is the registered plant entity or operator. UBS International Infrastructure Fund acquired a 50% interest in the plant from EDF Renewable Energy in 2014.
Overview
Key fields
- Reported capacity
- 161 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Onshore Wind Turbine
Primary generation technology.
- Registry anchor
- Plant 58774
EDF Renewable Asset Holdings, Inc. · Oldham County · ERCOT
- Operating status
- Operating
Spinning Spur Wind II is operating.
Resource stack
- 3 resources
SSPURTWO_SS3WIND1 · SSPURTWO_SS3WIND2
Profile
- Grid role
- Utility-scale wind generation in ERCOT's energy-only market.
- Physical build
- Spinning Spur Wind II: 87 General Electric (GE) onshore wind turbines (GE 1.85-87), each 1.85 MW (87 × 1.85 MW = 161 MW nameplate).
Structured profile
- Reported capacity
- 161 MW
Onshore Wind Turbine
- Operating status
- operating
Spinning Spur Wind II is operating.
- Location
- Oldham County
ERCOT
- Operator
- EDF Renewable Asset Holdings, Inc.
- Asset role
- wind
ERCOT · Oldham County
- Owner
- EDF Renewable Asset Holdings, Inc.
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 161 MW 161 MW summer | Onshore Wind Turbine Wind · WT | Jul 2014 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 161 MW
- National rank
- #410
- TX rank
- #132
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
3 ERCOT market resources · Wind
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsNearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Operator | Owner / developer associated with Spinning Spur Wind II. | |
| Market resources | SSPURTWO_SS3WIND1, SSPURTWO_SS3WIND2, SSPURTWO_WIND_1 | Linked ERCOT resources. |
| Grid selection | plant:plant-58774 | Canonical asset page /ercot/assets/plant/spinning-spur-wind-ii. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Fox Squirrel Solar | 577 MW | OH |
| Coyote Wind LLC | 242.5 MW | TX |
| Great Western Wind Energy, LLC | 225 MW | OK |
| Glaciers Edge Wind Project | 211.7 MW | IA |
| Lakefield Wind Project LLC | 205.5 MW | MN |
| Fenton Wind Farm | 205.5 MW | MN |
| Red Pine Wind Project | 200 MW | MN |
| Kelly Creek Wind Project | 184 MW | IL |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Dedication / groundbreaking announcedSource
EDF Renewables held a dedication for Spinning Spur (Spinning Spur I) and launched Spinning Spur II with a groundbreaking ceremony.
- Construction StartedSource
Construction of Spinning Spur II commenced in June 2013; developer materials list General Electric 1.85 MW turbines for the project.
- 50% equity sale announcedSpinning Sp...
UBS International Infrastructure Fund announced acquisition of a 50% equity stake in Spinning Spur II from EDF Renewable Energy; contemporaneous reports indicate financial details were not publicly disclosed and closing was tied to project milestones.
- Acquisition ClosedSpinning Sp...
Completion of construction / COD allowed closing of the sale of 50% of EDF Renewable Asset Holdings' equity interest in the Spinning Spur II project to UBS International Infrastructure Fund; financial details were not disclosed.
- Planned Commercial OperationEDF Renewab...
EDF Renewables reported an expected commercial operation date on or about July 1, 2014.
- Ownership TransactionSpinning Sp...
Upon commercial operation, EDF Renewable Energy (EDF Renewables) closed the sale of a 50% equity interest in the 161 MW Spinning Spur II wind project (Oldham County, TX) to UBS International Infrastructure Fund; financial terms were not disclosed.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Wildorado Wind LLC
Wind · 161 MW
Oldham County
Spinning Spur Wind LLC
Wind · 161 MW
Oldham County
Spinning Spur Wind III
Wind · 194 MW
Oldham County
Astra Wind Farm
Wind · 163 MW
Randall County