Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Glenarm | El Segundo Cogen |
|---|---|---|
| 265.6 MW | 180.1 MW | |
| Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine | Natural Gas Fired Combined Cycle | |
| City of Pasadena - (CA) | Chevron USA Inc-El Segundo | |
| 6 | 6 | |
| 38.5 GWh | 1.21 TWh | |
| 1.7% (2024) | 77.1% (2025) | |
| #269 of 825 | #415 of 538 | |
| 2024-12 | 2026-06 |