Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Desert Star Energy Center | Blythe Energy Inc |
|---|---|---|
| 366.4 MW | 591 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Desert Star Energy Center SDG&E | AltaGas Blythe Operations Inc | |
| 3 | 3 | |
| 318.6 GWh | 317.7 GWh | |
| 11.7% (2025) | 6.1% (2025) | |
| #299 of 538 | #259 of 538 | |
| 2026-06 | 2026-06 |