Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Sunrise Power LLC | La Paloma Generating Plant |
|---|---|---|
| 685.2 MW | 1,156 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Sunrise Power Co LLC | CXA La Paloma LLC | |
| 3 | 4 | |
| 2.11 TWh | 1.14 TWh | |
| 30.1% (2025) | 16.9% (2025) | |
| #189 of 538 | #70 of 538 | |
| 2026-06 | 2026-06 |