Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Blythe Energy Inc | AES Alamitos Energy Center |
|---|---|---|
| 591 MW | 678 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| AltaGas Blythe Operations Inc | AES Alamitos Energy, LLC | |
| 3 | 3 | |
| 317.7 GWh | 1.09 TWh | |
| 6.1% (2025) | 24.9% (2025) | |
| #259 of 538 | #195 of 538 | |
| 2026-06 | 2026-06 |