Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Otay Mesa Generating Project | Pio Pico Energy Center |
|---|---|---|
| 710.7 MW | 395.4 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combustion Turbine | |
| Otay Mesa Energy Center LLC | Pio Pico Energy Center LLC | |
| 3 | 3 | |
| 1.30 TWh | 65.9 GWh | |
| 26.2% (2025) | 1.9% (2024) | |
| #176 of 538 | #123 of 825 | |
| 2026-06 | 2024-12 |