Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Los Esteros Critical Energy Center | Lodi Energy Center |
|---|---|---|
| Capacity | 306.1 MW | 288.9 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Los Esteros Critical Energy Facility LLC | Northern California Power Agny |
| Operating units | 5 | 2 |
| Latest 12-month generation | 162.2 GWh | 390.6 GWh |
| Latest complete-year capacity factor | 5.8% (2025) | 22.9% (2025) |
| National technology rank | #359 of 538 | #368 of 538 |
| Latest EIA report | 2026-04 | 2026-04 |