Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Donald Von Raesfeld Power Plant | Los Esteros Critical Energy Center |
|---|---|---|
| 154 MW | 306.1 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| City of Santa Clara - (CA) | Los Esteros Critical Energy Facility LLC | |
| 3 | 5 | |
| 903.3 GWh | 169.1 GWh | |
| 57.2% (2025) | 5.8% (2025) | |
| #427 of 538 | #359 of 538 | |
| 2026-06 | 2026-06 |