Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Pio Pico Energy Center | Otay Mesa Generating Project |
|---|---|---|
| 395.4 MW | 710.7 MW | |
| Natural Gas Fired Combustion Turbine | Natural Gas Fired Combined Cycle | |
| Pio Pico Energy Center LLC | Otay Mesa Energy Center LLC | |
| 3 | 3 | |
| 65.9 GWh | 1.30 TWh | |
| 1.9% (2024) | 26.2% (2025) | |
| #123 of 825 | #176 of 538 | |
| 2024-12 | 2026-06 |