Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | El Segundo Energy Center LLC | AES Huntington Beach Energy Project |
|---|---|---|
| 537.4 MW | 699.2 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| NRG Energy Services LLC | AES Huntington Beach Energy, LLC | |
| 4 | 3 | |
| 47.1 GWh | 1.61 TWh | |
| 1.0% (2025) | 30.7% (2025) | |
| #298 of 538 | #180 of 538 | |
| 2026-06 | 2026-06 |