Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Carlsbad Energy Center | AES Huntington Beach Energy Project |
|---|---|---|
| 659 MW | 699.2 MW | |
| Natural Gas Fired Combustion Turbine | Natural Gas Fired Combined Cycle | |
| NRG California Peaker Operations LLC | AES Huntington Beach Energy, LLC | |
| 5 | 3 | |
| 190.6 GWh | 1.61 TWh | |
| 3.7% (2025) | 30.7% (2025) | |
| #56 of 825 | #180 of 538 | |
| 2026-06 | 2026-06 |