Ask the Grid
⌘K
Grids
ERCOT logoERCOT
NYISO logoNYISO
CAISO logoCAISO
PJM logoPJM
Library
Saved
Alerts
Reports
History
Explore
Stories
Data Catalog
Roadmap
MISOISO-NESPP
Preferences
Free account
Open the analytical workspace

Detailed market and asset intelligence, plus the tools to keep and share the work.

  • Settlement-point price analytics
  • Plant & battery operating detail
  • Full Radar & Deep agent mode
  • Saved views, history & exports
Sign up free
Enterprise
Read your own grid

Your assets, topology, and trades — one decision surface with the agent.

  • Connect your own data
  • Private Grid
  • Probabilistic model forecasts
  • Data downloads & exports
Talk to us
Help
Website
Profile
Settings
Invites
© 2026 Parisi Labs
About · Legal · Privacy · Changelog
  1. Home
  2. /Assets
  3. /Compare

Compare power plants

Registry, engineering, and operating metrics shown on a consistent EIA basis.

MetricBlythe Solar III, LLC Hybrid
Riverside County
Arlington Energy Center III
Riverside County
Capacity251.8 MW241 MW
TechnologyBatteries, Solar PhotovoltaicBatteries, Solar Photovoltaic
OperatorBlythe Solar III, LLCArlington Energy Center III
Operating units22
Latest 12-month generation348.2 GWh331.7 GWh
Latest complete-year capacity factor16.1% (2025)15.2% (2025)
National technology rank#348 of 7,234#360 of 7,234
Latest EIA report2026-042026-04

Generation comes from EIA-923. Capacity, unit counts, technology, and reporting relationships come from EIA-860. Incomplete reporting years are excluded from capacity-factor comparisons.