Ask the Grid
⌘K
Grids
ERCOT logoERCOT
NYISO logoNYISO
CAISO logoCAISO
PJM logoPJM
Library
Saved
Alerts
Reports
History
Explore
Stories
Data Catalog
Roadmap
MISOISO-NESPP
Preferences
Free account
Open the analytical workspace

Detailed market and asset intelligence, plus the tools to keep and share the work.

  • Settlement-point price analytics
  • Plant & battery operating detail
  • Full Radar & Deep agent mode
  • Saved views, history & exports
Sign up free
Enterprise
Read your own grid

Your assets, topology, and trades — one decision surface with the agent.

  • Connect your own data
  • Private Grid
  • Probabilistic model forecasts
  • Data downloads & exports
Talk to us
Help
Website
Profile
Settings
Invites
© 2026 Parisi Labs
About · Legal · Privacy · Changelog
  1. Home
  2. /Assets
  3. /Compare

Compare power plants

Registry, engineering, and operating metrics shown on a consistent EIA basis.

MetricArlington Energy Center III
Riverside County
Athos Solar Project
Riverside County
Capacity241 MW250 MW
TechnologyBatteries, Solar PhotovoltaicSolar Photovoltaic
OperatorArlington Energy Center IIISE Athos I, LLC
Operating units21
Latest 12-month generation331.7 GWh695.0 GWh
Latest complete-year capacity factor15.2% (2025)32.0% (2025)
National technology rank#360 of 7,234#76 of 7,234
Latest EIA report2026-042026-04

Generation comes from EIA-923. Capacity, unit counts, technology, and reporting relationships come from EIA-860. Incomplete reporting years are excluded from capacity-factor comparisons.