Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Baldy Mesa Solar & Storage | Hudson - High Desert Hybrid |
|---|---|---|
| 225 MW | 150 MW | |
| Solar Photovoltaic, Batteries | Batteries, Solar Photovoltaic | |
| AES Clean Energy | MN8 Energy LLC | |
| 2 | 2 | |
| 307.9 GWh | 291.6 GWh | |
| 15.1% (2025) | 22.0% (2025) | |
| #266 of 7,234 | #437 of 7,234 | |
| 2026-06 | 2026-06 |