Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Monticello Dam | Narrows PH |
|---|---|---|
| 11.5 MW | 10.2 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Solano Irrigation District | Yuba County Water Agency | |
| 3 | 1 | |
| 36.4 GWh | 80.8 GWh | |
| 36.0% (2024) | 90.2% (2024) | |
| #567 of 1,349 | #584 of 1,349 | |
| 2024-12 | 2024-12 |