Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Austin | Granite Shoals |
|---|---|---|
| 18 MW | 54 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Lower Colorado River Authority | Lower Colorado River Authority | |
| 2 | 2 | |
| 4.1 GWh | 22.4 GWh | |
| 2.6% (2024) | 4.7% (2024) | |
| #457 of 1,349 | #247 of 1,349 | |
| 2024-12 | 2024-12 |