Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Austin | Marble Falls |
|---|---|---|
| 18 MW | 39.6 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Lower Colorado River Authority | Lower Colorado River Authority | |
| 2 | 2 | |
| 4.1 GWh | 15.2 GWh | |
| 2.6% (2024) | 4.4% (2024) | |
| #457 of 1,349 | #308 of 1,349 | |
| 2024-12 | 2024-12 |