Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Marshall Ford | Buchanan Dam (TX) |
|---|---|---|
| 108 MW | 54.9 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Lower Colorado River Authority | Lower Colorado River Authority | |
| 3 | 3 | |
| 24.0 GWh | 17.1 GWh | |
| 2.5% (2024) | 3.5% (2024) | |
| #141 of 1,349 | #246 of 1,349 | |
| 2024-12 | 2024-12 |