Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Spinning Spur Wind III | Mariah del Norte |
|---|---|---|
| Capacity | 194 MW | 230.4 MW |
| Technology | Onshore Wind Turbine | Onshore Wind Turbine |
| Operator | Boralex US Operations LLC | BHE Renewables, LLC |
| Operating units | 1 | 1 |
| Latest 12-month generation | 815.8 GWh | 910.9 GWh |
| Latest complete-year capacity factor | 47.9% (2024) | 45.0% (2024) |
| National technology rank | #350 of 1,362 | #177 of 1,362 |
| Latest EIA report | 2024-12 | 2024-12 |