Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Wolf Hollow II | Midlothian Energy Facility |
|---|---|---|
| Capacity | 1,231.2 MW | 1,734 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Constellation Power, Inc | Midlothian Energy LLC |
| Operating units | 3 | 6 |
| Latest 12-month generation | 5.02 TWh | 7.20 TWh |
| Latest complete-year capacity factor | 50.4% (2025) | 45.7% (2025) |
| National technology rank | #53 of 538 | #14 of 538 |
| Latest EIA report | 2026-06 | 2026-06 |