Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Amistad Dam & Power | Marble Falls |
|---|---|---|
| 66 MW | 39.6 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| International Bound & Wtr Comm | Lower Colorado River Authority | |
| 2 | 2 | |
| 50.6 GWh | 15.2 GWh | |
| 8.7% (2024) | 4.4% (2024) | |
| #221 of 1,349 | #308 of 1,349 | |
| 2024-12 | 2024-12 |