Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Amistad Dam & Power | Toledo Bend |
|---|---|---|
| 66 MW | 80 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| International Bound & Wtr Comm | Entergy Texas Inc. | |
| 2 | 2 | |
| 50.6 GWh | 0 MWh | |
| 8.7% (2024) | 0.0% (2024) | |
| #221 of 1,349 | #187 of 1,349 | |
| 2024-12 | 2024-12 |