Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | French Landing Dam | Four Mile Hydropower Project |
|---|---|---|
| 1.6 MW | 2 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Eagle Creek Renewable Energy, LLC | Eagle Creek Renewable Energy, LLC | |
| 1 | 4 | |
| 8.5 GWh | 9.0 GWh | |
| 60.3% (2024) | 51.0% (2024) | |
| #1,150 of 1,349 | #1,106 of 1,349 | |
| 2024-12 | 2024-12 |