Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Spier Falls | Stewarts Bridge |
|---|---|---|
| 47 MW | 38.5 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Erie Boulevard Hydropower LP | Erie Boulevard Hydropower LP | |
| 2 | 2 | |
| 186.1 GWh | 132.7 GWh | |
| 45.1% (2024) | 39.2% (2024) | |
| #239 of 1,349 | #314 of 1,349 | |
| 2024-12 | 2024-12 |