Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Indeck Corinth Energy Center | Castleton Energy Center |
|---|---|---|
| Capacity | 147 MW | 72 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Indeck-Corinth Ltd Partnership | Fortistar Castleton Power |
| Operating units | 2 | 2 |
| Latest 12-month generation | 422.3 GWh | 87.1 GWh |
| Latest complete-year capacity factor | 32.7% (2024) | 13.8% (2024) |
| National technology rank | #432 of 538 | #477 of 538 |
| Latest EIA report | 2024-12 | 2024-12 |