Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Indeck Corinth Energy Center | Kennedy International Airport Cogen |
|---|---|---|
| Capacity | 147 MW | 121.2 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Indeck-Corinth Ltd Partnership | KIAC Partners |
| Operating units | 2 | 3 |
| Latest 12-month generation | 422.3 GWh | 398.6 GWh |
| Latest complete-year capacity factor | 32.7% (2024) | 37.4% (2024) |
| National technology rank | #432 of 538 | #446 of 538 |
| Latest EIA report | 2024-12 | 2024-12 |