Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Saranac Facility | Selkirk Cogen |
|---|---|---|
| Capacity | 285.6 MW | 434 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Saranac Power Partners LP | Selkirk Cogen Partners LP |
| Operating units | 3 | 5 |
| Latest 12-month generation | 354.9 GWh | 92.4 GWh |
| Latest complete-year capacity factor | 14.1% (2024) | 2.4% (2024) |
| National technology rank | #373 of 538 | #320 of 538 |
| Latest EIA report | 2024-12 | 2024-12 |