Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Peach Bottom | Surry |
|---|---|---|
| 2,876.4 MW | 1,695 MW | |
| Nuclear | Nuclear | |
| Constellation Nuclear | Virginia Electric & Power Co | |
| 2 | 2 | |
| 21.94 TWh | 11.99 TWh | |
| 87.1% (2025) | 89.0% (2025) | |
| #4 of 54 | #33 of 54 | |
| 2026-06 | 2026-06 |