Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Pensacola | Keystone Dam |
|---|---|---|
| 129.6 MW | 70 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Grand River Dam Authority | USCE-Tulsa District | |
| 7 | 2 | |
| 349.1 GWh | 1.6 GWh | |
| 30.7% (2024) | 0.3% (2024) | |
| #120 of 1,349 | #213 of 1,349 | |
| 2024-12 | 2024-12 |