Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Pensacola | Broken Bow Dam |
|---|---|---|
| 129.6 MW | 100 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Grand River Dam Authority | USCE-Tulsa District | |
| 7 | 2 | |
| 349.1 GWh | 108.9 GWh | |
| 30.7% (2024) | 12.4% (2024) | |
| #120 of 1,349 | #157 of 1,349 | |
| 2024-12 | 2024-12 |