2W Permian Solar Project Hybrid
Ørsted · Andrews County · ERCOT
2W Permian Solar Project Hybrid, which Ørsted markets as Permian Energy Center, is a 460 MW AC solar-plus-storage facility in Andrews County, Texas. The operating site combines 420 MW of solar generation with a 40 MW, one-hour battery and is registered as EIA Plant ID 63255 under 2W Permian Solar, LLC.
Overview
Key fields
- Reported capacity
- 460 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Solar + battery storage
Primary generation technology.
- Registry anchor
- Plant 63255
2W Permian Solar, LLC · Andrews County · ERCOT
- Operating status
- Operating
2W Permian Solar Project Hybrid is operating.
- Load zone
- West
ERCOT resource-adequacy records place EUNICE_PV1 and EUNICE_PV2 in the West load zone.
Equipment
- 1,300,000 panels
Installed equipment documented in public project records.
- Resource stack
- 3 resources
EUNICE_ESR1 · EUNICE_PV1 · EUNICE_PV2
Profile
- Grid role
- Utility-scale solar generation in ERCOT's energy-only market.
- Load zone
- ERCOT West. Andrews is the county shown in ERCOT resource-adequacy records, not a load zone or settlement point.
Structured profile
- Reported capacity
- 460 MW
Batteries; Solar Photovoltaic.
- Operating status
- operating
2W Permian Solar Project Hybrid is operating.
- Location
- Andrews County
ERCOT
- Operator
- 2W Permian Solar, LLC
- Asset role
- solar
ERCOT · Andrews County
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 2WPBA | 40 MW 40 MW summer | Batteries Electricity used for energy storage · BA | Oct 2021 | Operating |
| 2WPSO | 420 MW 420 MW summer | Solar Photovoltaic Solar · PV | Aug 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 420 MW
- National rank
- #16
- TX rank
- #8
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
3 ERCOT market resources · Battery / storage, Solar
Dispatch
3 mo through May 22, 2026Cycles/day is discharged energy vs. usable capacity (~28 MWh). Capacity factor is avg discharge vs. peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsNearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Transactions and agreements
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Market resources | EUNICE_ESR1, EUNICE_PV1, EUNICE_PV2 | Linked ERCOT resources. |
| Grid selection | plant:plant-63255 | Canonical asset page /ercot/assets/plant/2w-permian-solar-project-hybrid. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Generator enters operationEIA-860
EIA-860 lists generator 2WPSO with this operating date.
- Generator enters operationEIA-860
EIA-860 lists generator 2WPBA with this operating date.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.