Hecate Energy Frye Solar LLC
Repsol Renewables North America · Swisher County · ERCOT
Frye Solar is a large solar facility near Kress in Swisher County, Texas. EIA's May 2026 inventory reports one 500 MW operating generator record dated June 2024. Repsol reports a 632 MW installed project with nearly one million panels, completed in 2024, and a long-term power purchase agreement covering 89% of output.
Overview
Key fields
- EIA capacity
- 500 MW
May 2026 inventory
- Project capacity
- 632 MW
Repsol current portfolio
- Panel count
- Nearly 1 million
Repsol
- Contracted output
- 89%
Long-term PPA
- Current settlement point
- FRYE_SLR_ALL
ERCOT public mapping
- Registry anchor
- Plant 64233
Repsol Renewables NA
Resource stack
- 2 resources
FRYE_SLR_UNIT1 · FRYE_SLR_UNIT2
Profile
- Grid role
- Utility-scale solar generation in ERCOT.
- Capacity scope
- EIA reports a 500 MW operating generator record; Repsol reports 632 MW installed project capacity.
- Physical build
- Repsol reports nearly one million photovoltaic panels.
Structured profile
- EIA capacity
- 500 MW
EIA May 2026
- Project capacity
- 632 MW
Repsol
- Panels
- Nearly 1 million
Repsol
- PPA coverage
- 89% of output
Repsol
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 80995 | 500 MW 500 MW summer | Solar Photovoltaic Solar · PV | Jun 2024 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 500 MW
- National rank
- #8
- TX rank
- #3
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Developer | Developer for Hecate Energy Frye Solar LLC | |
| Market resources | FRYE_SLR_UNIT1, FRYE_SLR_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-64233 | Canonical asset page /ercot/assets/plant/hecate-energy-frye-solar-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Hecate Energy Outpost Solar LLC | 515 MW | TX |
| Hecate Energy Frye Solar LLCCurrent | 500 MW | TX |
| Jicarilla Solar 1 LLC | 70 MW | NM |
| Jicarilla Solar 2 | 50 MW | NM |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- EIA generator entered serviceEIA May 202...
EIA reports June 2024 for the operating generator record.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.