ENGIE Long Draw Solar LLC
ENGIE North America · Borden County · ERCOT
Long Draw Solar is a 225 MW photovoltaic facility in Borden County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62845, with service beginning in December 2020 and ENGIE North America as the registered operator. ENGIE describes itself as the long-term owner and operator. ENGIE reports a 15-year power-purchase arrangement serving four Texas municipal utilities.
Overview
Key fields
- Operating capacity
- 225 MW
EIA and ENGIE
- Commercial operation
- Dec 2020
EIA and ENGIE
- PPA term
- 15 years
Four municipal utilities
- Interconnection
- 138 kV
Long Draw switching station
- Resource stack
- 2 resources
LGDRAW_S_UNIT1_1 · LGDRAW_S_UNIT1_2
- Registry anchor
- Plant 62845
ENGIE North America
Profile
- Grid role
- Utility-scale solar generation serving ERCOT and four Texas municipal utilities.
- Operating record
- 225 MW · December 2020 service month.
Structured profile
- Operating capacity
- 225 MW
EIA and ENGIE
- Equipment
- 76 inverter stations
PUCT filing
- Owner and operator
- ENGIE North America
ENGIE
- Commercial operation
- December 2020
EIA
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| SP1 | 225 MW 225 MW summer | Solar Photovoltaic Solar · PV | Dec 2020 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 225 MW
- National rank
- #124
- TX rank
- #55
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Market resources | LGDRAW_S_UNIT1_1, LGDRAW_S_UNIT1_2 | Linked ERCOT resources. |
| Grid selection | plant:plant-62845 | Canonical asset page /ercot/assets/plant/engie-long-draw-solar-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Priddy Wind Project | 302.4 MW | TX |
| Prairie Hill Wind Project | 300 MW | TX |
| Iron Star Wind Project | 297.6 MW | KS |
| Solomon Forks Wind Project, LLC | 275.6 MW | KS |
| Triple H Wind Project | 250.2 MW | SD |
| King Plains Wind Project | 248.2 MW | OK |
| ENGIE Long Draw Solar LLCCurrent | 225 MW | TX |
| Las Lomas Wind Project | 201.6 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Standard generation interconnection agreement executedLong Draw i...
ENGIE and WETT executed the project interconnection agreement for the Long Draw 138 kV switching station.
- Project Entered ServiceEIA May 202...
EIA reports December 2020.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Juno Solar Project
Solar · 305.6 MW
Borden County
Texas Solar Nova 1
Solar · 252 MW
Kent County
Texas Solar Nova 2
Solar · 200 MW
Kent County