Taygete Energy Project LLC
Taygete Energy Project LLC · Pecos County · ERCOT
Taygete Energy Project is a 255 MW photovoltaic facility in Pecos County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62483, with service beginning in March 2021 and Taygete Energy Project LLC as the registered operator. 7X Energy developed the project and identified itself as owner during construction.
Overview
Key fields
- Operating capacity
- 255 MW
EIA May 2026
- Operating month
- Mar 2021
EIA
- Tax-equity investor
- Nestlé
First such investment
- Settlement point
- TAYGETE_ALL
ERCOT settlement point.
- Registry anchor
- Plant 62483
Taygete Energy Project LLC
Resource stack
- 2 resources
TAYGETE_UNIT1 · TAYGETE_UNIT2
Profile
- Grid role
- Utility-scale solar generation in ERCOT.
- Operating capacity
- 255 MW EIA nameplate.
- Development
- 7X Energy developed the project and identified itself as owner during construction.
Structured profile
- Operating capacity
- 255 MW
EIA May 2026
- Developer and construction-period owner
- 7X Energy
Public project record
- Tax-equity investor
- Nestlé
Marathon Capital
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| PV1 | 255 MW 255 MW summer | Solar Photovoltaic Solar · PV | Mar 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 255 MW
- National rank
- #69
- TX rank
- #30
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Financing
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Project company and EIA registered operator | Taygete Energy Project LLC | EIA May 2026 generator inventory |
| Developer and construction-period owner | Marathon Capital Taygete transaction | |
| Tax-equity investor and purchaser of all renewable attributes | Marathon Capital Taygete transaction | |
| Market resources | TAYGETE_UNIT1, TAYGETE_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-62483 | Canonical asset page /ercot/assets/plant/taygete-energy-project-llc. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Project Entered ServiceEIA May 202...
EIA reports March 2021.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Greasewood Solar
Solar · 255 MW
Pecos County
Taygete II Energy Project
Solar · 203.8 MW
Pecos County