Taygete II Energy Project
West Texas Solar Project II LLC · Pecos County · ERCOT
Taygete II Energy Project is a 203.8 MWac / 258.4 MWdc solar facility in Pecos County, Texas. EIA's May 2026 inventory lists West Texas Solar Project II LLC as the registered operator and July 2023 as the service month. The project's Chapter 313 record identifies the company as West Texas Solar Project II LLC, formerly Taygete Energy Project II LLC. Its 2019 application described a planned 255 MWac project on approximately 3,500 leased acres; those development-stage figures are not presented as the final operating configuration.
Overview
Key fields
- AC capacity
- 203.8 MW
EIA May 2026
- DC capacity
- 258.4 MW
EIA May 2026
- Commercial operation
- Jul 2023
EIA May 2026
- Development scope
- 255 MWac
2019 Chapter 313 application
- Settlement point
- TAYGETE2_ALL
ERCOT settlement point.
- Registry anchor
- Plant 64075
West Texas Solar Project II LLC
Resource stack
- 2 resources
TAYGETE2_UNIT1 · TAYGETE2_UNIT2
Profile
- Grid role
- Utility-scale photovoltaic generation in ERCOT.
- Current operating rating
- 203.8 MWac / 258.4 MWdc.
- Project identity
- West Texas Solar Project II LLC · formerly Taygete Energy Project II LLC.
- Development record
- The 2019 application proposed 255 MWac on approximately 3,500 leased acres.
Structured profile
- Operating rating
- 203.8 MWac / 258.4 MWdc
EIA May 2026
- Registered operator
- West Texas Solar Project II LLC
EIA May 2026
- Former project name
- Taygete Energy Project II LLC
Texas Comptroller
- Development parcel scope
- Approximately 3,500 leased acres
2019 application
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| TAYG2 | 203.8 MW 203.8 MW summer | Solar Photovoltaic Solar · PV | Jul 2023 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 203.8 MW
- National rank
- #136
- TX rank
- #61
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Market resources | TAYGETE2_UNIT1, TAYGETE2_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-64075 | Canonical asset page /ercot/assets/plant/taygete-ii-energy-project. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Chapter 313 application postedTaygete II ...
The application described a planned 255 MWac solar project on approximately 3,500 leased acres.
- Agreement Assignment PostedTexas Compt...
The Comptroller record documents the project-company name transition to West Texas Solar Project II LLC.
- Solar generator entered serviceEIA May 202...
EIA reports July 2023.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Taygete Energy Project LLC
Solar · 255 MW
Pecos County
Midway Solar - TX
Solar · 182 MW
Pecos County