Temple Power Station
BKV-BPP Power LLC · Bell County · ERCOT
Temple Power Station is a two-block natural-gas combined-cycle complex in Bell County, Texas, registered as EIA Plant ID 58001. EIA reports six generators with 1,606.4 MW of nameplate capacity and 1,580 MW of net summer and net winter capability. ERCOT lists three resources for Temple I and three for Temple II, with resource in-service dates of August 1, 2014 and August 1, 2015. Each block uses a 2-on-1 Siemens combined-cycle configuration. BKV-BPP Power LLC owns the two plants; BKV holds 75% of the joint venture and Banpu Power US holds 25%.
Overview
Key fields
- Net summer capability
- 1,580 MW
EIA operating capability.
- Nameplate capacity
- 1,606.4 MW
Six EIA generators.
- Configuration
- Two 2-on-1 blocks
Temple I and Temple II.
- Registry anchor
- Plant 58001
Temple Generation Holdings LLC · Bell County · ERCOT
- Resource in-service
- 2014 / 2015
Temple I / Temple II.
- Resource stack
- 6 resources
PANDA_T1_TMPL1CT1 · PANDA_T1_TMPL1CT2 · PANDA_T1_TMPL1ST1
Profile
- Plant configuration
- Temple I and Temple II are adjacent 2-on-1 combined-cycle blocks with three ERCOT resources each.
- Current ownership
- BKV-BPP Power LLC owns both plants; BKV holds 75% and Banpu Power US holds 25%.
Structured profile
- Net summer / winter
- 1,580 / 1,580 MW
EIA Form 860
- Owner
- BKV-BPP Power LLC
75% BKV · 25% Banpu Power US
- EIA operator
- Temple Generation Holdings LLC
Plant 58001
- TCEQ regulated entity
- RN105380216
Operating permits O3544 and O3851
- Coordinate parcel
- 451819
22.65 acres · CXA Temple 2 LLC
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CTG-1 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | Jul 2014 | Operating |
| CTG-2 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | Jul 2014 | Operating |
| CTG-3 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | May 2015 | Operating |
| CTG-4 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CT | May 2015 | Operating |
| STG-1 | 339.2 MW 326 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CA | Jul 2014 | Operating |
| STG-2 | 339.2 MW 326 MW summer | Natural Gas Fired Combined Cycle Natural Gas · CA | May 2015 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 1,606.4 MW
- National rank
- #17
- TX rank
- #3
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
4 ERCOT market resources · Combined-cycle gas
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Market resources | PANDA_T1_CC1_1, PANDA_T1_CC1_2, PANDA_T2_CC1_1, PANDA_T2_CC1_2 | Linked ERCOT resources. |
| Grid selection | plant:plant-58001 | Canonical asset page /ercot/assets/plant/temple-power-station. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Temple II EPC contract announcedBechtel Tem...
Bechtel announced the 758 MW Temple II EPC award with Siemens as consortium partner.
- Temple II financing announcedTemple II f...
Goldman Sachs and Credit Suisse arranged senior debt; Ares Capital served as documentation agent.
- Generators enter operationEIA-860
EIA-860 lists generator CTG-1, generator CTG-2, generator STG-1 with this operating date.
- Generators enter operationEIA-860
EIA-860 lists generator CTG-3, generator CTG-4, generator STG-2 with this operating date.
- Temple I acquisition announcedBKV Temple ...
BKV and Banpu Power US announced the $430 million acquisition.
- Temple I acquisition closedBanpu Templ...
The 50/50 BKV-Banpu joint venture acquired 100% of Temple I for $430 million.
- Temple I operating permit renewedTCEQ Temple...
TCEQ issued the renewed Federal Operating Permit O3544 for Temple I.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Midlothian Energy Facility
Natural Gas · 1,620 MW
Ellis County
Forney Energy Center
Natural Gas · 1,770 MW
Kaufman County
Wolf Hollow II
Natural Gas · 1,103.4 MW
Hood County
Jack County
Natural Gas · 1,241 MW
Wise County