Titan Solar Project
SB Energy · Culberson County · ERCOT
Titan Solar is a utility-scale photovoltaic facility in Culberson County, Texas. EIA's May 2026 inventory lists one 260 MW operating generator under Plant ID 63320, with service beginning in December 2021 and SE Titan LLC as the registered operator. A pre-operation FERC filing described a planned approximately 290 MWac configuration and five-mile 138 kV generator tie; those planning figures are not presented as the completed plant's final rating.
Overview
Key fields
- EIA capacity
- 260 MW
AC nameplate
- Operating month
- Dec 2021
EIA May 2026
- Technology
- Photovoltaic
Utility scale
- Generator
- TITAN
EIA record
- Registry anchor
- Plant 63320
SE Titan LLC
Resource stack
- 2 resources
TI_SOLAR_UNIT1 · TI_SOLAR_UNIT2
Profile
- Grid role
- Utility-scale solar generation in ERCOT.
- Capacity scope
- 260 MW EIA nameplate · 367 MWdc company rating.
- Operating date
- December 2021 in EIA's current generator inventory.
- Pre-operation record
- A FERC filing described an approximately 290 MWac plan and a five-mile 138 kV generator tie.
Structured profile
- EIA capacity
- 260 MW
EIA May 2026
- Project company
- SE Titan LLC
EIA
- Operating month
- Dec 2021
EIA
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| IPTTN | 260 MW 260 MW summer | Solar Photovoltaic Solar · PV | Dec 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 260 MW
- National rank
- #66
- TX rank
- #28
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Project company and EIA registered operator | SE Titan LLC | EIA May 2026 generator inventory |
| Market resources | TI_SOLAR_UNIT1, TI_SOLAR_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-63320 | Canonical asset page /ercot/assets/plant/titan-solar-project. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Project Entered ServiceEIA May 202...
EIA reports December 2021 for generator TITAN.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Aragorn Solar Project
Solar · 180 MW
Culberson County
Taygete Energy Project LLC
Solar · 255 MW
Pecos County
Prospero Solar II
Solar · 250 MW
Andrews County