West Raymond Wind Farm is a 239.8 MW wind facility in Willacy County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62855, with service beginning in October 2021 and RWE Clean Energy as the registered operator. RWE describes the project as 240 MW and part of a four-project Texas partnership. The reviewed transaction records allocate ownership across the four-project portfolio at 51% Algonquin, 25% RWE and 24% Greencoat, with RWE continuing as operator.
Overview
Key fields
- Operating capacity
- 239.8 MW
EIA May 2026
- RWE project rating
- 240 MW
RWE
- Algonquin portfolio stake
- 51%
Four-project partnership
- RWE portfolio stake
- 25%
Operator
- Greencoat portfolio stake
- 24%
Four-project partnership
- Registry anchor
- Plant 62855
RWE Clean Energy
Resource stack
- 2 resources
TRUENO_UNIT1 · TRUENO_UNIT2
Profile
- Grid role
- Utility-scale wind generation in ERCOT.
- Operating record
- 239.8 MW EIA · 240 MW RWE project rating · Oct 2021 service.
- Portfolio ownership
- Algonquin 51% · RWE 25% · Greencoat 24%.
- Operation
- RWE remained operator after the portfolio sell-downs.
Structured profile
- Operating capacity
- 239.8 MW
EIA
- Project rating
- 240 MW
RWE
- Operator
- RWE
RWE
- Portfolio ownership
- 51% Algonquin · 25% RWE · 24% Greencoat
RWE
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WRAYM | 239.8 MW 239.8 MW summer | Onshore Wind Turbine Wind · WT | Oct 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 239.8 MW
- National rank
- #164
- TX rank
- #54
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Wind
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryRelated parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Portfolio 25% portfolio owner and project operator | Financing covers a portfolio that includes West Raymond Wind Farm LLC. | |
| 24% owner through the four-project partnership | RWE Greencoat transaction announcement | |
| Market resources | TRUENO_UNIT1, TRUENO_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-62855 | Canonical asset page /ercot/assets/plant/west-raymond-wind-farm-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Bright Arrow Solar, LLC | 403.6 MW | TX |
| Cartwheel 1 - Storage, LLC | 300 MW | TX |
| Peregrine Solar | 300 MW | TX |
| Fifth Standard Solar PV, LLC (Hybrid) | 287 MW | CA |
| Radfords Run Wind Farm | 278 MW | IL |
| Emily Solar, LLC | 273.6 MW | IL |
| Copper Mountain Solar 3 | 255 MW | NV |
| Copper Mountain Solar 5, LLC | 252 MW | NV |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Project Entered ServiceEIA May 202...
EIA reports October 2021.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Bruennings Breeze Wind Farm
Wind · 228 MW
Willacy County
Hidalgo Wind Farm LLC
Wind · 250 MW
Hidalgo County
Raymond Wind Farm, LLC
Wind · 200.2 MW
Willacy County
Las Majadas Wind Farm
Wind · 272.6 MW
Willacy County