Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Friant Hydro Facility | Big Creek 8 |
|---|---|---|
| 37.5 MW | 30 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Friant Power Authority | Southern California Edison Co | |
| 4 | 2 | |
| 59.8 GWh | 173.8 GWh | |
| 18.2% (2024) | 66.0% (2024) | |
| #320 of 1,349 | #198 of 1,349 | |
| 2024-12 | 2024-12 |