Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Friant Hydro Facility | Big Creek 2A |
|---|---|---|
| 37.5 MW | 55 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Friant Power Authority | Southern California Edison Co | |
| 4 | 2 | |
| 59.8 GWh | 302.6 GWh | |
| 18.2% (2024) | 53.7% (2025) | |
| #320 of 1,349 | #137 of 1,349 | |
| 2024-12 | 2026-06 |