Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Russell City Energy Center | Los Medanos Energy Center |
|---|---|---|
| 655 MW | 678.3 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Russell City Energy Company LLC | Los Medanos Energy Center LLC | |
| 3 | 3 | |
| 1.62 TWh | 2.69 TWh | |
| 27.4% (2025) | 41.8% (2025) | |
| #205 of 538 | #193 of 538 | |
| 2026-06 | 2026-06 |