Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Bastrop Energy Center | Lost Pines 1 Power Project |
|---|---|---|
| Capacity | 618.7 MW | 609 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Bastrop Energy Partners, LP | Lower Colorado River Authority |
| Operating units | 3 | 3 |
| Latest 12-month generation | 2.26 TWh | 2.83 TWh |
| Latest complete-year capacity factor | 42.4% (2025) | 48.7% (2025) |
| National technology rank | #236 of 538 | #242 of 538 |
| Latest EIA report | 2026-06 | 2026-06 |