Lost Pines 1 Power Project
Lost Pines 1 Power Project is a three-generator natural-gas combined-cycle facility at Lost Pines Power Park east of Bastrop, Texas. EIA's May 2026 inventory reports 609 MW nameplate, 510 MW net summer, and 540 MW net winter capability across two combustion turbines and one steam turbine, all dated May 2001. LCRA reports a 540 MW net maximum and 50% ownership; its affiliate GenTex Power Corporation owns the other 50%. GenTex developed the project with Calpine, whose former share is now owned by LCRA.