Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Lily Solar Hybrid | Fence Post Solar Hybrid Project, LLC |
|---|---|---|
| Capacity | 201.9 MW | 308 MW |
| Technology | Solar Photovoltaic, Batteries | Batteries, Solar Photovoltaic |
| Operator | Lily Solar, LLC | Fence Post Solar Project, LLC |
| Operating units | 2 | 2 |
| Latest 12-month generation | 311.1 GWh | 509.9 GWh |
| Latest complete-year capacity factor | 18.0% (2025) | 19.4% (2025) |
| National technology rank | #329 of 7,234 | #118 of 7,234 |
| Latest EIA report | 2026-06 | 2026-06 |