Fence Post is a co-located solar-and-storage plant in Navarro County, Texas. EIA's May 2026 inventory reports 236 MWac / 300 MWdc of solar generation plus a separate 72 MW / 115 MWh battery system, with all three generator records dated September 2024. Enel uses a separate company project scope of 297 MW of solar and 86 MW of storage and announced the project operating in February 2024.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
Enel
EIA plant 66801 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| FNCBE | Batteries | Operating | 72 | 115 |
| FNCPT | Solar Photovoltaic | Operating | 236 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| FNCBE | 72 MW 70 MW summer | Batteries BA | Sep 2024 | Operating |
| FNCPT | 236 MW 236 MW summer | Solar Photovoltaic PV | Sep 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports September 2024 for two solar records and one battery record.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Battery / storage, Solar
Cycles/day is discharged energy vs. usable capacity (~117 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at FENCESLR_ALL over 365 days (2025-10-26 to 2026-10-25).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Fence Post Solar Hybrid Project reports 72 MW battery storage + 236 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Fence Post Solar Hybrid Project is a Batteries; Solar Photovoltaic; facility in Navarro County, TX, participating in the ERCOT market.
Fence Post Solar Hybrid Project is in Navarro County, TX, inside the ERCOT balancing area.
Fence Post Solar Hybrid Project is operated by Fence Post Solar Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Fence Post Solar Hybrid Project reported 516.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Fence Post Solar Hybrid Project ranks #129 of 7,597 operating plants of the same technology nationally. It ranks #56 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.