Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Copperhead Solar, LLC | Orion III Solar Project |
|---|---|---|
| Capacity | 250 MW | 250 MW |
| Technology | Solar Photovoltaic, Batteries | Solar Photovoltaic |
| Operator | Geronimo Power | Ben Milam Solar 3 LLC |
| Operating units | 2 | 1 |
| Latest 12-month generation | 266.4 GWh | 524.7 GWh |
| Latest complete-year capacity factor | 13.5% (2025) | 25.2% (2025) |
| National technology rank | #266 of 7,234 | #76 of 7,234 |
| Latest EIA report | 2026-06 | 2026-06 |