Orion III Solar Project
Orion III Solar Project is a 250 MWac photovoltaic facility in Milam County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 66821, with service beginning in August 2024 and Ben Milam Solar 3 LLC as the registered operator. SB Energy reports a 326 MWdc project rating and identifies Orion III as one of three Orion Solar Belt projects that reached commercial operation in October 2024. The three-project belt totals about 900 MWdc and supplies Google data-center operations; those belt-wide figures are not Orion III-only equipment counts.