Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | S C Moore | Harris Hydro |
|---|---|---|
| 195.4 MW | 76.4 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Great River Hydro, LLC | Brookfield White Pine Hydro LLC | |
| 5 | 4 | |
| 341.5 GWh | 170.4 GWh | |
| 19.9% (2024) | 25.4% (2024) | |
| #71 of 1,349 | #196 of 1,349 | |
| 2024-12 | 2024-12 |